Flight 194 is a commercial mission for Ariane 5. Launcher 551, the 46th production phase ARIANE 5, is the twenty-fourth of the 30 PA contract launchers, for which ASTRIUM is production prime contractor. 551 is consequently the twenty-fifth complete launcher to be delivered to Arianespace, integrated and checked out under ASTRIUM responsibility in the Launcher Integration Building (BIL).
In a dual-payload configuration using the SYLDA 5 “A” (6.4m high) system and a long pattern fairing (total height: 17m), the launcher is carrying the European satellites ASTRA 3B in the upper position and COMSATBw-2 in the lower position.
ASTRIUM, Communications and Public Relations Directorate – Media
6 rue Laurent Pichat, 75216 PARIS Cedex 16
If you are journalist and you wish to be on our press release distribution list and receive information about media events, please contact us:
Image of the Week
Discover the Astrium Photo Library
For any use of our images and photographs other than personal, informational, non-commercial use, prior approval from the copyright owners must be obtained. Please contact us multimedia@astrium.eads.net
Copyright 2011 Astrium